Ventilated façade, administrative building
Year 2025
Aluminium substructure, 120 mm mineral wool and composite panel cladding across 640 sqm of façade.


Context
An ’80s building with heavy heat loss through the walls and a degraded façade.
What we did
- aluminium substructure with thermally broken brackets
- 120 mm mechanically fixed mineral wool
- composite panels with a 40 mm ventilated air gap
Outcome
Gas consumption in the first winter dropped by roughly a third against the three-year average.